Loading...
ORD 1287 09/24/2019 or CIO � o ro r C x S ORDINANCE �7 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF CIBOLO, TEXAS AMENDING EXHIBIT "A- 6" "DRAINAGE AND UTILITY FEES" TO ORDINANCE 1232 "AMENDING AND ESTABLISHING FEES FOR CERTAIN LICENSES, PERMITS, AND OTHER SERVICES PROVIDED BY THE CITY OF CIBOLO"; TO INCLUDE WASTEWATER SERVICE FEES; PROVIDING FOR SEVERABILITY; REPEALING ANY OTHER CODE PROVISIONS, ORDINANCES, PARTS OF ORDINANCES, AND OTHER PROVISIONS IN CONFLICT HEREWITH; AND ADOPTING AN EFFECTIVE DATE. WHEREAS,the City of Cibolo(the "City")has established by ordinance and resolution,fees for licenses, permits, and services provided by the City; and WHEREAS,due to the need for periodic modification of said fees and for the purposes of efficiency,the City Council desires to future fee changes by ordinance; and WHEREAS, the Schedule of Fees attached as "Exhibit A" reflects revisions to certain fees, a restatement of certain fees not revised, and a consolidation of all such fees; and WHEREAS, due to adoption of Ordinance 1284, adopting the City of Cibolo annual budget for fiscal year 2019-2020 which reflects an increase in wastewater rates; and WHEREAS, the City Council has determined that it is in the best interest of the City to update the fee schedule. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CIBOLO,TEXAS: SECTION 1 AMENDMENT Portions of Exhibit "A-6" of Ordinance 1232 are hereby amended as follows: Wastewater Rates Residential: i First 3,000 gallons of water used �^ $17.00 3,001 +gallons of water used additional $4.95 Per Tgal Commercial: First 3,000 gallons of water used $20.00 3,001 +gallons of water used additional $4.95 Per Tgal Multi-family: First 3,000 gallons of water used x LUE $20.00 x LUE (3,001+x LUE)gal of water used additional $4.95 Per Tgal SECTION 2 REPEALER All ordinances or parts of ordinances in conflict herewith are hereby repealed to the extent of such conflict. SECTION 3 SEVERABILITY If any section, subsection, sentence, clause, or phrase of this Ordinance is for any reason held to be unconstitutional or illegal,such decision shall not affect the validity of the remaining sections of this Ordinance. The City Council hereby declares that it would have passed this Ordinance, and each section, subsection, clause, or phrase thereof, irrespective of the fact that any one or more sections, subsections, sentences, clauses, or phrases be declared void; and that in lieu of each clause or provision of this Ordinance that is invalid, illegal, or unenforceable there be added as a part of the Ordinance a clause or provision as similar in terms to such invalid, illegal, or unenforceable clause or provision as may be possible, legal,valid,and enforceable. SECTION 4 EFFECTIVE DATE This Ordinance shall be effective upon approval of the City Council of the City of Cibolo, Texas, and the publication of the fees twice in the newspaper of record. PASSED,APPROVED AND ADOPTED THIS 24TH DAY OF SEPTEMBER,2019. APPROVED: `Stosh Bo yor ATTEST: Peggy Cimics,City Secretary , Cibolo Fee Schedule-2020 Public Information Fees Description Cost Unit Malerials Standard Paper Copy $0.10 per page Rewritable CD (CD-RW) $1.00 per disc Non-rewritable CD (CD-R) $1.00 per disc Digital Video Disc(DVD) $3.00 per disc Other electronic media Actual cost Oversize Paper Copy (e.g. 11x17 not including maps) $0.50 per page Specially Maps 11" x 17" $10.00 24" x 36" $30.00 Miscellaneous Supplies Actual cost Postage and Shipping Charges Actual cost Labor Charge Programming $28.50 per hour Locating, compiling and reproducing I $1S.001 per hour A labor charge shall not be billed in connection with complying with requests that are for 50 or fewer pages of paper No sales tax shall be applied to copies of public information Texas Administrative Code Title 1 -Administration Part 3 -Office of the Attorney General Chapter 70-Cost of Copies of Public Information Rule 70.3 Charges for Providing Copies of Public Information Fee Chart for Liquor Permits Authorizing City of Cibolo Code Description of Permits Statute TABC TABC Fees Code Fees AW Manufacturer's Agent's Warehousing Permit Ch 55 $1,500 $750 A Agent's Permit Ch 35 $20 $10 AB Airline Beverage Permit Ch 34 $4,400 $2,200 PE Beverage Cartage Permit Ch 44 $40 $20 J Bonded Warehouse Permit Ch 46 $300 $150 JD Bonded Warehouse Permit(Dry Area) Ch 46 $300 $150 B Brewer's Permit Ch 12 $3,000 $1,500 DA Brewer's Self-Distribution Permit Ch 12A $500 $250 C Carrier's Permit Ch 41 $60 $30 CB Caterer's Permit Ch 31 $1,000 $500 TB Daily Temporary Mixed Beverage Permit(Per Day) Ch 30 $50 $25 amended by resolution 9/25/18 City Secretary PGA A-1 Cibolo Fee Schedule- 2020 TN Daily Temporary Private Club Registration Permit Ch 33 $50 $25 DS Out-of-State Winery Direct Shipper's Permit Ch 54 $150 $75 D Distiller's&Rectifier's Permit Ch 14 $3,000 $1,500 DK Distiller's Agent's Permit Ch 15 $20 $10 FB Food and Beverage Certificate Ch 25 $200 $100 BP Brewpub License Ch 74 $1,000 $500 FC Forwarding Center Authority Rule 35.6 $2,000 $1,000 1 Industrial Permit Ch 38 $120 $60 E Local Cartage Permit Ch 43 $60 $30 ET Local Cartage Transfer Permit Ch 42 $60 $30 LP Local Distributor's Permit Ch 23 $200 $100 LI Local Industrial Alcohol Manufacturer's Permit Ch 47 $200 $100 T Manufacturer's Agent's Permit Ch 36 $20 $10 MR Market Research Packager's Permit Ch 49 $200 $100 MI Minibar Permit Original $4,000 $2,000 1st Renewal $3,000 $1,500 2nd Renewal $2,000 $1,000 3rd and All Subsequent Renewals Ch 51 $1,500 $750 MB Mixed Beverage Permit Original $6,000 $3,000 1st Renewal $4,500 $2,250 2nd Renewal $3,000 $1,500 3rd and All Subsequent Renewals Ch 28 $1,500 $750 RM Mixed Beverage Permit with FB Original $6,000 $3,000 1st Renewal $4,500 $2,250 2nd Renewal $3,000 $1,500 3rd and All Subsequent Renewals Ch 28 $1,500 $750 LB Mixed Beverage Late Hours Ch 29 $300 $150 U Nonresident Brewer's Permit Ch 13 $3,000 $1,500 S Nonresident Seller's Permit Ch 37 $300 $150 P Package Store Permit Ch 22 $1,000 $500 PS Package Store Tasting Permit Ch 52 $50 $25 Q Wine Only Package Store Ch 24 $150 $75 PT Passenger Train Beverage Permit Ch 48 $1,000 $500 O Private Carrier's Permit Ch 42 $60 $30 NE Private Club Exemption Certificate Permit Ch 32 $0 $0 N Private Club Registration Permit- 2 year permit $1,500 Option 1 $750 0 to 250 Members 251 to 450 Members $2,700 $1,350 451 to 650 Members $3,900 $1,950 651 to 850 Members $5,100 $2,550 851 to 1000 Members $6,000 $3,000 Over 1000 Members Ch 32 $6 Per Member $3 per member N Private Club Registration Permit-Option 2 Original $7,000 $3,500 1st Renewal $5,500 $2,750 2nd and All Subsequent Renewals Ch 32 $4,000 $2,000 NS Private Club Beer and Wine Permit Ch 32 $3,000 1 $1,500 amended by resolution 9/25/18 City Secretary PG.2 Ciholo Fee Schedule - 2020 NL Private Club Late Hours Permit Ch 32 $1500 $750 L Private Storage Permit Ch 45 $200 $100 PR Promotional Permit Ch 50 $600 $300 K Public Storage Permit Ch 45 $200 $100 W Wholesaler's Permit Ch 19 $3,750 $1,875 X General Class B Wholesaler's Permit Ch 20 $600 $300 LX Local Class B Wholesaler's Permit Ch 21 $150 $75 PB Passenger Bus Beverage Permit Ch 48A $1000 $500 V Wine and Beer Retailer's Permit Excursion Boat Ch 25 $260 $130 Y Wine and Beer Retailer's Permit Railway Car(Fee—Per Car) Ch 25 $60 $30 Z Wine Bottler's Permit Ch 18 $450 $225 G Winery Permit Ch 16 $150 $75 GF Winery Festival Permit Ch 17 $100 $50 GS Winery Storage Permit Ch 45 $200 $100 Fee Chart for Beer Licenses Surcharges are subject to annual change. Code Description of Licenses Authorizing TABC Fees City of Cibolo Statute TABC Fees code BK Agent's Beer License Ch 73 $20 $10 BC Branch Distributor's License Ch 66 $150 $75 BB General Distributor's License Ch 64 $600 $300 BI Importer's License Ch 67 $40 $20 BJ Importer's Carrier's License Ch 68 $40 $20 BD Local Distributor's License Ch 65 $150 $75 BA Manufacturer's License 1st Establishment $1,500 $750 2nd Establishment $3,000 $1,500 3rd,4th,&5th Establishments $8,550 $4,275 Excess of 5 Establishments Ch 62 $16,800 $8,400 DB Manufacturer's Self-Distribution License Ch 62A $500 $250 MW Manufacturer's Warehouse License Ch 62.13 $600 $300 BS Nonresident Manufacturer's License Ch 63 $1,500 $750 FB Food and Beverage Certificate Ch 25 $200 $100 BP Brewpub License Ch 74 $1,000 $500 BF Beer Retailer's Off Premise License Ch 71 $120 $60 BE Retail Dealer's On-Premise License Ch 69 $300 $150 (Excluding BEXAR, DALLAS, HARRIS, TARRANT Counties) BE Retail Dealer's On-Premise License Original Ch 69 $2,000 $1,000 (BEXAR, DALLAS, HARRIS, Renewal $1,500 $750 TARRANT Counties) BL Retail Dealer's On-Premise Late Hours License Ch 70 $500 $250 SL Storage License Ch 75 $400 $200 BH Temporary License Ch 72 $30 $15 HP Temporary Wine and Beer Retailer's Permit Ch 27A $30 $15 SB Special Three-Day Wine and Beer Permit Ch 27B $30 $15 amended by resolution 9/25/18 City Secretary PG.3 A_1 Cibolo Fee Schedule-2020 CA Temporary Auction Permit Ch 53 $25 $13 BG Wine and Beer Retailer's Permit Ch 25 $350 (Excluding BEXAR, DALLAS, HARRIS, TARRANT Counties) $175 BG Wine and Beer Retailer's Permit Original Ch 25 $2,000 $1,000 (BEXAR, DALLAS, HARRIS, Renewal $1,500 TARRANT Counties) $750 BQ Wine and Beer Retailer's Off-Premise Permit Ch 26 $120 $60 WP Water Park Permit Ch 56 $60 $30 amended by resolution 9/25/18 City Secretary PGA Cibolo Fee Schedule- 2020 Building Inspections and Permitting Fees Residential Building Permit Fee $50.00 for issuing the permit plus: Minimum Permit Fee $50.00 New Single Family Residential (one&two family dwellings) per square foot $0.65 New Accessory Structures per square foot $0.65 Remodels/Additions per square foot $0.65 Residential Plan Review Fee 50%of Building Permit Fee Commercial Building Permit Fee Commercial Building valuation shall be based on the greater amount of either contract value or$100.00 per square foot. Alterations/Tenant Finish Out permit valuation=contract value Commercial Plan Review Fee 50%of Building Permit Fee $50.00 for issuing the permit plus: Valuation Permit Fee Schedule $1 to$500 $25 $501 to$2,000 $25 for the first$500, plus$6 for each additional $100 or fraction thereof,to and including$2,000 $2,001 to$40,000 $115 for the first$2,000, plus$11 for each additional$1,000 or fraction thereof, to and including$40,000 $40,001 to$100,000 $533 for the first$40,000, plus$9 for each additional$1,000 or fraction thereof, to and including$100,000 $100,001 to$200,000 $1,073 for the first$100,000, plus$8 for each additional $1,000 or fraction thereof,to and including$200,000 $200,001 to$300,000 $1,873 for the first$200,000, plus$7 for each additional$1,000 or fraction thereof, to and including$300,000 $300,001 to$500,000 $2,573 for the first$300,000 plus$6 for each additional $1,000 or fraction thereof,to and including$500,000 $500,001 to$1,000,000 $3,773 for the first$500,000, plus$5 for each additional $1,000 or fraction thereof,to and including$1,000,000 $1,000,001 to $5,000,000 $6,273 for the first$1,000,000, plus$3 for each additional$1,000 or fraction thereof, to and including$5,000,000 Over$5,000,001 $18,273 for the first$5,000,000, plus$2 for each additional $1,000 or fraction thereof. Plan Review Fee: 1. Residential Plans 50%of Building Permit fee 2. Commercial Plans 50%of Building Permit fee amended by ordinance 06/11/2019 P&E PG.S A-2 Cibolo Fee Schedule- 2020 3.All Withdrawn/Changed Plans 50%of Building Permit fee Contractor Registration Fee/Requirements All contractors wishing to work in the City of Cibolo must be registered with the City. Registration will require a completed Application, Certificate of Insurance, and Fee as indicated below. Registration for General,Commercial, Residential, Demolition,Site Development and/or Sign Contractors (valid for one (1)year) $75.00 Registration for Licensed Electrical, Mechanical, Plumbing, Fire Alarm, Fire Sprinkler/Suppression,and Irrigation Contractor's (Valid for one (1)year) $0.00 Electrical Permit Issue Permit(Base Fee): $50.00 Switch,Jack, Plug, Data Connection, Receptacle, Sensor& Light Fixture(each) $0.60 220v,Appliance Outlet or Disconnect(each) $5.00 Furnace,or A/C Unit(evaporator/condenser coils,etc.) (each) $7.00 Meter Loop(Temporary/Permanent)(each) $12.50 Main Panel or Sub Panel (each) $12.50 Motor Load or Load of 1 hp and larger-Commercial (each) $15.00 Lighted Sign (each) $20.00 Meter Loop(Temporary/Permanent)600 volt or less-Commercial (each) $30.00 Meter Loop(Temporary/Permanent)over 600 volt-Commercial (each) $50.00 Solar Equipment(Flat Fee) $100.00 New Residential Electrical Permit will be a flat fee based on the following: Up to 1,500 square feet $200.00 1,501 to 2,000 square feet $226.00 2,001 to 2,500 square feet $252.00 2,501 to 3,000 square feet $278.00 3,001 to 3,500 square feet $304.00 3,501 to 4,000 square feet $330.00 4,001 to 4,500 square feet $356.00 4,501 to 5,000 square feet $382.00 Over 5,000 square feet $382.00+$26.00 for each additional 500 square feet or portion thereof. Heating and Air Conditioning(Mechanical) Permit Issue Permit(Base Fee): $50.00 Heating and Cooling Unit-New Construction (each) $12.00 Heating and Cooling Unit-Replacement(each) $25.00 Duct Outlet(each) $7.00 Refrigeration Unit-Commercial (each) $25.00 Exhaust Hood, Make up Air,or Exhaust Duct-Commercial (each) $25.00 Plumbing Permit Issue Permit(Base Fee): $50.00 Fixtures(i.e. bathtub, sink, lavatory,shower,outside hose bib etc.) (each) $5.50 Water Heater- New Construction (each) $12.00 Water Heater- Replacement(each) $25.00 amended by ordinance 06/11/2019 P&E PG.6 A_2 Cibolo Fee Schedule- 2020 Water Softener (each) $25.00 Reverse Osmosis (each) $25.00 Combination Water Softener and Reverse Osmosis (each) $35.00 Gas Piping- Up to 5 Openings $25.00 Additional Gas Openings (each) $5.00 Gas Test (each) $25.00 Lint, Grease, or other type of Interceptor/Tank (each) $35.00 Under Slab Plumbing Repairs $45.00 Underground Waterline (Domestic/ Fire) Commercial $100.00 Residential $15.00 Sewer Commercial $100.00 Residential $15.00 Medical Gas (Oxygen -02; Nitrous Oxide-N20;Medical Compressed Air- MedAir; Nitrogen - N2; Vacuum- Vac; Carbon Dioxide- CO2; Helium - He) Issue Permit (Base Fee) $50.00 Med Gas Piping- Up to 5 Openings $25.00 Additional Med Gas Openings (each) $5.00 Reclaim Water Line Openings Issue Permit (Base Fee) $50.00 Reclaim Water Piping- Up to 5 Openings $40.00 Additional Openings (each) $5.00 Certificate of Occupancy Certificate of Occupancy $50.00 Pre Certificate of Occupancy Inspection $200.00 Failure to obtain a Certificate of Occupancy $500.00 Miscellaneous Building Fees Any Permits not reflected or related to the schedule: $50.00 Fence Permit (residential, commercial) $50.00 Fuel Tanks and related equipment and piping $50.00+$100.00 per tank Foundation Repair(residential) $225.00 Manufactured Homes/ Mobile Home Placement $100.00 (Placement- to include stairs and decks,Additional permits for utility hook ups is required) Moving Permit $100.00 (Moving-any Building or Structure) amended by ordinance 06/11/2019 P&E PG.7 A_2 Cibolo Fee Schedule- 2020 Outdoor Structures Shed-Pre-Assembled (flat fee) $75.00 Outdoor Structures- Less than 125 square feet (flat fee) $100.00 Outdoor Structures- Larger than 125 square feet (flat fee) $125.00 (Outdoor structures include,but not limited to,site built sheds,decks,concrete slabs,pergolas, covered patios etc.) Sheds 100 square feet or less do not require a permit. Portable Storage Unit-(Up to 90 Days) $75.00 (If an extension is needed, it will be on a case by case basis and will require a new permit.) Exception: Storage units for moving and kept on site for no more than 14 days shall not require a permit. Swimming Pools Inground Pool $500.00 Above ground pool $150.00 Spa Placement $25.00 Additional Fees Move in prior to Certificate of Occupancy: $500.00 Per Day Permit Renewal: 100%of original Permit Fee Note: This would be applicable for temporary permits that expire and are renewed/extended. A Plan Review would only be charged if there were changes to the original description of work. Re-Review Fee: $150.00 Note: This fee will apply to reviews after the original review has been completed. Re-Inspection Fee: For each failure-per trade 1st Failure- $75.00 Each Additional - $100.00 Note: If re-inspection has been called for and the second inspection revealed original turn down items have not been corrected in part or in whole, in addition to the above fees, a seventy-two(72)hour notice of inspection will be required before another inspection will be conducted. Proceeding without the proper Inspection: $150.00+ Failure Fee Lost Plan Fee: $50.00 If original field set is lost, misplaced,stolen or tampered with in any way, the builder must request a new field set from the City of Cibolo. Refunds: Minus Plan Review Fee Building and Trade permit refunds (no refund if work began or if permit expired) Permits which do not require a Plan Review Fee $25.00 Admin Fee amended by ordinance 06/11/2019 P&E PG.8 A-2 Cibolo Fee Schedule-2020 Starting work before permit issued: The fee is 2.5 (250%)times the fee of the total original permit fee(to include the permit fee and plan review fee) Failure to Comply: $200.00 Any person who shall continue any work after having been served with a Stop Work Order, except such work as that person is directed to perform to remove a violation or unsafe condition,shall be liable to a fine of$200.00 Failure to schedule required inspection(s): $50.00 Any person/company who fails to schedule a required inspection(s)within 180 days of permit issuance for work described by a permit. No additional permits will be issued to any person/company who has more than one(1)expired permit. Demolition Permit Single Family Dwellings, including detached accessory structures $85.00 (residential in nature) Other than single family dwellings,for the first(1st) unit $100.00 Commercial single story $100.00 Commercial two&three story $200.00 Commercial over three stories $300.00 Irrigation Permit Issue Permit(Base Fee): $50.00 Irrigation System -Residential- 1 and 2 Family Dwellings $50.00 Irrigation System-Commercial $100.00 Backflow Preventer- 2" or less $20.00 Backflow Preventer-Greater than 2" $25.00 Residential - 1 & 2 Family Dwellings-No Plan Review fee Commercial Plan Review Fee-1/2 of the total permit Fire Alarm Permit Issue Permit(Base Fee): $50.00 Switch,Jack, Data Connection, Device,Sensor, Relay, Module etc. (each) $0.50 220v Appliance Outlet or Disconnect(each) $4.00 Main Panel or Sub Panel (each) $10.00 Motor Load of 1 hp and larger(each) $10.00 Plus 1/2 of the total permit for Plan Review Fire Sprinkler/Suppression Permit Issue Permit(Base Fee): $50.00 Fire Pump(each) $20.00 Fire Sprinkler System (each) $35.00 Fixed Suppression Systems (each) $25.00 Fire Sprinkler Head or Similar Device (each) $0.60 amended by ordinance 06/11/2019 P&E PG.9 A_2 Cibolo Fee Schedule-2020 Backflow Preventer- 2" or less(each) $20.00 Backflow Preventer-Greater than 2" (each) $25.00 Plan Review-100%of the total permit If Fire Alarm/Fire Sprinkler plans are reviewed by a 3rd party and work begins without a permit, a non-compliance fee of$250.00 will be assessed. Site Development Permit Issue Permit $75.00 +0.008 times the value of the Value to include all work.materials,profit,overhead. contract Any changes that decrease the original contract will not be considered for refund. Change orders that exceed the original contract must be permitted based on the same fee structure. Sign Permit: Annual Billboard Permit- Payable January 1st of each year $100.00 Illuminated Sign (each) $115.00 Non-Illuminated Sign (each) $75.00 Replacement Sign-Same Mounts (each) $50.00 Banner or Temporary Sign (each) $50.00 Flagpole (each) $50.00 Master Sign Program $1,000.00 Master Sign Program Revision (each) $500.00 Public Notification Signage (Rezoning,Variance, Replat,Annexation) $65.00 Zoning Variance Process(each) Pre- $250.00 Post- $500.00 FOOD AND BEVERAGE FEES: Annual Health Permit Level Restaurants or Retail Establishments with on-site cooking,schools etc. a) Gross Sales of$0.00 to$99,999.99 $195.00 b) Gross Sales of$100,000.00 or more $245.00 Level Daycares without on-site cooking,Bars, Nightclubs etc. $150.00 Level Retail Establishments with pre-packaged foods;to include $95.00 hot dog rotisseries,and Mobile Vendors Temporary Permits $55.00 Event Permit a) 1-3 vendors, per vendor $45.00 b)4 or more vendors, per vendor $35.00 Follow up Inspection $65.00 amended by ordinance 06/11/2019 P&E PG.10 Cibolo Fee Schedule-2020 ZONING AND DEVELOPMENT FEES Application Type Related Fees Pre-Application Meeting Per Meeting with Staff $0 First $100 Second $100 Subsequent Discussion Only Agenda Item City Staff Fee $200 Voluntary Annexation (temporary agriculture zoning) $0 (permanent zoning request) $750 Non-Annexation Agreement $200 Zoning Applications: Conditional Use Permit(CUP), 0 to 2 acres $750+$25/acre Planned Unit Development(PUD) 2+to 5 acres $1,000+$25/acre and Zoning Change 5+to 20 acres $1,500+$25/acre 20+to 50 acres $2,000+$20/acre 50+to 100 acres $3,000+$20/acre 100+acres $4,000+$15/acre PUD As above+$1,200 CUP/PUD Amendment 50%of zoning fee (per amended acreage) The maximum zoning,PUD&CUP fee shall not exceed$7,500,excluding any additional fees for any other application listed heron. Detail PUD $1,500 Detail PUD Amendment $750 Vested Rights Petition City Attorney and Staff Fees $2,500+Attorney Fees Development Rights Determination City Attorney and Staff Fees $2,500+Attorney Fees Zoning Verification Letter City Staff Fee $150 Development Applications: Any Site Plan 0-2 acres $750+$15/DU and/or$50/acre Dwelling Unit(DU)per residential and/or acres per non-residential All other Site Plans $1,200+$15/DU and/or$50/acre Dwelling Unit(DU)per residential and/or acres per non-residential With a maximum fee of$5,000 excluding additional fees for any item listed in this section below. Appeal of Denied Site Plan to Additional$1,000 the P&Z Commission Land Study $1,500+Consultant Fee Master Plan $1,500 Mixed Use Concept Plan $1,500 amended by ordinance 06/11/2019 P&E PG.11 A-2 Cibolo Fee Schedule- 2020 Amendment to: Land Study, Master $500 Plan, Mixed Use Concept Plan Tree Deferral $500 (postponement of tree mitigation to a later phase) Tree Removal Permit $SO Tree Affidavit $50 Variance&Waiver Applications: Zoning Pre-Development $500 each variance Post-Development $1500 each variance Variance to any non-zoning UDC Each Exception $1,200 first Design Standards $500 each additional (Design&Construction Manual) Variance fee maybe reduced 50%for requests that result from actions of previous owners of an affected property,i.e.private access easement. Vested Rights Petition City Attorney and Staff Fees $2,500+Attorney Fees Development Rights Determination City Attorney and Staff Fees $2,500+Attorney Fees City Plan Amendment: City $500 Future Land $500 Future $500 Unified $500 Plat Related Applications: Minor Plat and/or Amended Plat Single &Two-Family Residential $500+$20/DU (Administratively reviewed&approved) Non-residential, Mixed Use, $750+$25/acre Other residential Redline Amended Plat 50%of Amended Plat Fee (Administrative or P&Z approval prior to recordation) Single and Two Family Residential Preliminary Plat, Final Plat, Replat, 0 to 5 acres $750+$25/DU Development Plat 5+to 10 acres $1,000+$25/DU 10+to 20 acres $1,250+$25/DU All plats require Consultant Fee 20+to 50 acres $1,500+$25/DU 50+acres $2,000+$25/DU A replat that requires a public hearing must pre-pay ; Uther and Non-Residential, $1,500+$25/DU and/or$50/acre Mixed Use, PUD Dwelling Unit(DU)per residential and/or acres Preliminary/Final Plats pay full plat fees i per non-residential and only one consultant fee _ Construction Plan Review $100 Conveyance Plat or Legal Instrument Each $500 i i amended by ordinance 06/11/2019 P&E PG.12 A_2 Ciholo Fee Srhedule - 2020 Plat Recordation Guadalupe County As required by Guadalupe Recordation Fee County Cibolo Recordation Fee $150/plat Floodplain Permit Residential $50 Non-Residential $150 CLOMR $200 LOMR without CLOMR $200 LOMR with CLOMR $200 LOMA $100 Flood zone verification letter $25 Master Drainage Plan With PUDs and Master Plans $200 Traffic Impact Analysis Study Review $200 TIA Revision Review $100 TIA Scoping Meeting $0 Park Land & Improvement Fees Park Land Fees paid by $600 per single or two-family unit or developer(at platting) Council approved 8% Park Land dedication Park Improvement Fee paid $600 per single or two-family by builder (at bldg permit) unit or Council approved 8%dedication Park Land & Improvement $400/Dwelling Unit Fees by developer/builder of multi-family units City Agreements: Public Improvement Agreement $1,500+$100/acre Development Agreement Max$4,000+City Attorney Fees Other Agreements Amendment to an Agreement 50%of Agreement fee Consultant Fees: Review of construction plans, Professional fees as billed by $2,000, minimum as a deposit reports, drainage studies,TIAs & any Engineering and Planning against consultant fees. Staff other documents associated with consultants, or any may reduce this deposit to plats, site plans, mixed use concept consultant utilized by the $750 against consultant fees if plans or special legal instruments or City to review development a project is of minor nature submittals as necessary per applications where limited engineering application submitted review is anticipated. Legal Fees: All legal fees incurred by the City in City Attorney Reimbursement due to City the review, preparation and/or based on actual legal fees amendment of any legal document incurred by the City. associated with a development application i.e. Private Street Agreement or Public Infrastructure Agreement. amended by ordinance 06/11/2019 P&E PG.13 A_2 Cibolo Fee Schedule- 2020 Public Notification Fees: All fees associated for the cost of Reimbursement due to City publication, site signage & public based on actual notice fees. notice by certified mail. Extension of Time: Fee may be waived by the City Each $2,000 Council if extension is requested prior to any approval expiring & subject to the applicant proving cause for the extension. Granting an extension of time, the applicant will be subject to new UDC regulations & standards adopted by the City. Postponement: on a posted agenda $1,000 + new notice for which a public hearing was publication & mailing scheduled. Applicant shall be required to pay the cost for additional notice and legal publication. Codes, Manuals, Maps Unified Development Code (UDC), DVD or CD $10 Cibolo Design & Construction 24 x 36 Color Map Print $30 Manual, Comprehensive/Master 11 X 17 Color Map Print $10 Plan, Parks Master Plan, Zoning Map, City Limits/ETJ Map, Other Custom Map Request (GIS Fees) Minimum 1/2 hour $40 Per hour amended by ordinance 06/11/2019 P&E PG.14 A-3 Cibolo Fee Schedule - 2020 CIBOLO POLICE DEPARTMENT - MISC. FEE's A. Finger Prints. Per Card $10.00 B. City Solicitor Permits. Note: All Fee's Are Per Permit and Per Individual. Background Check $10.00 Permit (Original) - Note: Permit is Valid for Six (6) Months From Date Issued $45.00 Permit (Renewal) - For an additional 6-month period if renewed w/in 60 days of original permit expiration date. If original permit expired more than 60 days, the permit will be treated as a new permit application and $45.00 other fees will apply. Replacement/(Lost, Stolen, Illegible)Solicitor Badge $10.00 Canvasser Badge (Good for 30 Days - For Material Handout - No Public Contact) $10.00 C. Police Reports and Other Documentation. Police Report Copies (per page) $0.10 CD/DVD Copies $1.00 Accident/CRASH Reports $6.00 Body-worn camera video or audio recording(per recording) $10.00 Body-worn camera video or audio recording (per minute of recording) $1.00 D. Background Checks. $10.00 E. Clearance Letters. $10.00 F. Alarm Permits. 1. Residential (Home) Alarm System a. Initial Permit $25.00 b. Renewal for 1 Year $15.00 c. Renewal for 3 Years $30.00 2. Commercial Facility $50.00 3. Financial Institution $100.00 4. Educational or Governmental Institution No Fee 5. Late Fee $10.00 6. False Alarms (Per Each Alarm Activation) a. 4- 5 Within Any 12 - Month Period $50.00 b. 6- 7 Within Any 12- Month Period $75.00 c. 8 or More Within Any 12 - Month Period $100.00 d. Permit Re-instatement $25.00 6. Monitoring Company Failure to Verify- Per Incident $100.00 a. Appeal Fee Per Appeal $25.00 7. Use of a Non-permitted Alarm System Per Incident $100.00 8. Use of Alarm System During Alarm Permit Suspension, Per Alarm $200.00 9. Failure to Comply With or Violation of Section 26- 70 Per Incident $200.00 F. Payment BV Credit/Debit Card Usage Fee. 3%of Amt. G. Officer Provided Off-Duty Stand-By/(Security)• Per Officer per hour. (4 hour minimum required) $35.00 Note: When alcohol is to be served at event: (a.) Less than (<) 100 guests=Security is not needed (b.) Greater than(>)100 guests=Security is automatically needed amended by resolution 9/25/18 PD PG.15 A-4 Cibolo Fee Schedule - 2020 Fire Department Service Fees Fire Department Response Fees:* 1. Interstate Highway Response $375.00 per Hour or Fraction Thereof per Incident 2. Swift Water/ Flood Response $575.00 per Hour or Fraction Thereof per Incident 3. Haz-Mat Response $575.00 per Hour or Fraction Thereof per Incident Use of Absorbents $25.75 per bag or Fraction exceeding one bag Use of Doam / Bio. $120.75 Up to 5 Gallons; $ 21.50 per Gallon Thereafter Special Supplies and Actual Cost+3 % Disposable Supplies (e.g. absorbent pads, booms, disposable coveralls, golves, brooms, and similar) 4. Natural Gas Main/Service or $275.00 per Hour or Fraction Thereof per Incident LP-Gas Leak Response 5. Other Utility Response $150.00 per Hour or Fraction Thereof per Incident 6. Elevator Rescue Response $150.00 per Incident (2nd and Subsequent response per year) 7. Unwarranted and False Alarm Response $100.00 per Incident (3rd and Subsequent response per year) 8. Fire Watch Personnel, Firefighter $23.50 per Person per Hour Personnel, Officer $33.50 per Person per Hour 9. Railway Incident Response $250.00 per Hour or Fraction Thereof per Incident 10. Technical Rescue Response $250.00 per Incident 11. Special Events Calculated as Itemized Response Fire Department Equipment Usage Fees:* 1. Command Vehicle $75.00 per Hour or Fraction Thereof 2. Fire Marshal Vehicle $75.00 per Hour or Fraction Thereof 3. Class A Pumper $275.00 per Hour or Fraction Thereof 4. Aerial Apparatus $325.00 per Hour or Fraction Thereof S. Tanker Apparatus $200.00 per Hour or Fraction Thereof 6. Brush Truck $200.00 per Hour or Fraction Thereof 7. Rescue Boat $150.00 per Hour or Fraction Thereof 8. Rehab Unit $100.00 per Hour or Fraction Thereof 9. Use of City Loader/Tractor $375.00 per Hour or Fraction Thereof 10. Apparatus on Standby three quarter the Hourly Rate Fire Department Equipment Replacement Fees:* 1. Damaged or Contaminated Protective Actual Cost+ 3 % Clothing, Gear, Equipment,Tools, Hoses,Apparatus, and similar. Requiring replacement. 2. Broken or Damaged Equipment, Actual Repair Cost+ 10% Tools, Apparatus, and similar. Capable of being repaired. amended by resolution 9/25/18 FD PG.16 Cibolo Fee Schedule- 2020 Itemized Response: * The City has the option to bill each incident as an independent event with custom assessment rates, for each incident using, itemized rates deemed usual, customary, and reasonable. These incidents will be billed, itemized per apparatus, per personnel, plus products, supplies, and equipment used. Residential Response: Calls for service at residential structure fires shall not be subject to any fees. amended by resolution 9/25/18 FD PG.17 Cibolo Fee Schedule-2020 ANIMAL CONTROL SERVICES A. Pet Registration. Current Rabies Vaccination and Micro-chipped Free/No Cost Re-Registration due to a Lapse in Rabies Vaccination $5.00 Micro-Chip Implant $15.00 B. Impoundment Fee(s). Must be paid for each animal captured. Any animal impounded without registration or current Rabies Vaccination, owners or caretakers will be issued citations for any and all violation(s). Altered dog or cat (1st Impoundment) $30.00 Altered dog or cat (2nd Impoundment) $54.00 Unaltered dog or cat (1st Impoundment) $44.00 Unaltered dog or cat (2nd Impoundment) $66.00 Fowl or other Small Animal $25.00 Zoological and/or Circus Animal $100.00 C. Boarding Fee's. Paid for ea. Day and for ea. Animal Confined by Animal Shelter or Contractor. Dog or cat per Day of Confinement $12.00 Fowl or other Small Animal $8.00 Zoological and/or Circus Animal $300.00 Dog or cat per day of Confinement Due to Owner Incarceration $10.00 D.Voluntary Relinquishment of Ownership (No livestock will be taken in). "Owner Surrenders" will be taken only when the Municipal Shelter has available space. Unaltered dog or cat $50.00 Altered dog or cat $40.00 Other animal (no livestock) $35.00 Euthanasia Request (If requested, this fee is in addition to the surrender fee.) $40.00 E. Live Trap Rental and Fee(s) Trap Deposit $40.00 Daily Rental $2.00 Trap Replacement $125.00 F. Adoption Fee(s) Feline Adoption $100.00 Canine Adoption $125.00 Other Animal Adoption $35.00 G. Dangerous Dog Permit $125.00 H. Excess Animal Permit $45.00 Fine Schedule as Established by the City Council of Cibolo, Texas Minimum Penalty Schedule 1. Invalid Rabies Vaccination $50.00 2. Unregistered Animal $30.00 amended by resolution 9/25/18 Animal Control PG.18 Cibolo Fee Schedule-2020 3. Animal Free of Restraint a. Unaltered dog or cat $100.00 b. Altered dog or cat $75.00 c. Any Other Animal (Other than Livestock) $50.00 d. Livestock $100.00 4. Excess Animals, per Animal Over the Limit $30.00 5. Improper Care Causing Suffering $150.00 6. Animal Abandonment $150.00 7. Improper Tethering $85.00 8. Failure to Sterilize Animal $175.00 9. Unconfined and/or Non-muzzled Dangerous Animal $200.00 10. Failure to Surrender Animal for Rabies Quarantine $200.00 11. Unlawful Harboring of a Vicious/Dangerous Animal $200.00 amended by resolution 9/25/18 Animal Control PG.19 Cibolo Fee Schedule- 2020 DRAINAGE AND UTILITY FEES Drainage Rates $5.00 per ERU Single Family Residential: Small (<2218 sq ft impervious area) 0.7 ERU Average (2218-3716 sq ft impervious area) 1.0 ERU Large (3717-8000 sq ft impervious area) 1.5 ERU Rural Lot (>8000 sq ft impervious area) 2.0 ERU Commercial: ERU = Impervious area/2889 sq ft(minimum 1.0 ERU,maximum capped at 25 ERU) Chipper Service $20.00 Water Rates Residential: 1,200 gallons or less(special rate) $12.50 Over 1,200 gallons(base rate) $25.00 Tier 1 1,201 to 7,000 additional $5.50 Per Tgal Tier 2 7,001 to 15,000 additional $7.00 Per Tgal Tier 3 15,001 to 30,000 additional $8.50 Per Tgal Tier 4 30,001 to 50,000 additional $10.00 Per Tgal Tier 5 Over 50,000 additional $12.50 Per Tgal Multifamily: First(1,000 gallons x LUE) based on Meter Size (below) Tier 1 1,001 to 7,000(x LUE) additional $5.50 Per Tgal Tier 2 7,001 to 15,000 (x LUE) additional $7.00 Per Tgal Tier 3 15,001 to 30,000 (x LUE) additional $8.50 Per Tgal Tier4 30,001 to 50,000(x LUE) additional $10.00 PerTgal Tier 5 Over 50,000 (x LUE) additional $12.50 Per Tgal Commercial &Hydrant meters: First 1,000 gallons based on Meter Size(below) Tier 1 1,001 to 7,000 additional $5.50 Per Tgal Tier 2 7,001 to 15,000 additional $7.00 Per Tgal Tier 3 15,001 to 30,000 additional $8.50 Per Tgal Tier 4 30,001 to 50,000 additional $10.00 Per Tgal Tier 5 Over 50,000 additional $12.50 Per Tgal Meter Size-LUE $ Meter Size $ 3/4"-1.5 30.00 3"-16 320.00 1"-2.5 50.00 4"-25 500.00 1.511-5 1 100.00 6"-50 1,000.00 2"-8 160.00 10"-115 1 2,300.00 amended by resolution 9/25/18 Drainage, Utility, Park PG.20 A-6 Cibolo Fee Schedule- 2020 Wastewater Rates Residential: First 3,000 gallons of water used $17.00 3,001+gallons of water used additional $4.95 Per Tgal Commercial: First 3,000 gallons of water used $20.00 3,001+gallons of water used additional $4.95 Per Tgal Multi-family: First 3,000 gallons of water used x LUE $20.00 xcuE (3,001+x LUE)gal of water used additional $4.95 Per Tgal Tgal=1,000 gallons Account Fees: Account Set Up Fee $30.00 Account Transfer Fee $30.00 Water Acquisition Fee $6.00 per month Administrative Fee $25.00 Late Penalty $10.00 Daily Hydrant Rental Fee $7.50 perday Security Deposits: Residential $60.00 Temporary Service Request(5 days or less) $20.00 Commercial/Industrial Two months estimated use Garbage Only Accounts Two months prepayment Hydrant Meters $650.00 Commercial Rolloff Dumpsters $800.00 Meter Installation and Tap Fees Installation: 5/8" Meter to 1-1/2" Meter* $60.00 2" Meter to less than 4" Meter* $75.00 4" Meter or larger* $120.00 Hydrant Meter $50.00 *plus meter cost Water Taps: Water Impact Fee (if applicable) $3,595.00 Short Service(main on same side of street)** $520.00 Long Service (main no on same side of street)** $1,585.00 **plus meter/supply cost Wastewater Taps: Wastewater Impact Fee(if applicable) $1,770.00 CCMA Fee $1,800.00 plus admin fee $15.00 5 ft deep or less $1,373.00 Each additional foot over 5 feet $375.00 •Due to fluctuation of meter and supply costs,parts will be quoted at time of permitting at our cost plus 10% amended by resolution 9/25/18 Drainage, Utility, Park PG.21 Cibolo Fee Schedule- 2020 PARK FEES Niemietz Park Picnic Area Deposit $55.00 Resident $75.00 Nonresident $115.00 Lights per hour omit separate hourly cost Outlets per hour omit separate hourly cost Niemietz Meeting Room Deposit Omit as a separate option Resident Omit as a separate option Nonresident Omit as a separate option Room Cost per hour Omit as a separate option Niemietz Meeting Room and Kitchen Deposit $150.00 Resident $150.00 Nonresident $225.00 Room Cost per hour omit separate hourly cost Niemietz Pavilion Deposit $30.00 Schlather Park Resident $75.00 Veterans Park Pavilion#1 omit separate hourly cost Nonresident $115.00 omit separate hourly cost Electric per hour(Niemietz Park Only) $20.00 Veterans Park Pavilion #2 Deposit $30.00 Resident $50.00 omit separate hourly cost Nonresident $75.00 omit separate hourly cost amended by resolution 9/25/18 Drainage, Utility, Park PG.22