Loading...
RES 1565 09/25/2018 OF C, A,��p1111H+/Mq////yam p, H� Q r�p Z /'fid//N/NMI111 Tex A5 "City of Choice" RESOLUTION # %JAS A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CIBOLO, TEXAS AMENDING THE CITY'S SCHEDULE OF FEES, PURSUANT TO ORDINANCE NUMBER 1232 APPROVED ON THE 10TH DAY OF APRIL 2018. WHEREAS, the City Council of the City of Cibolo approved Ordinance 1232 on April 10, 2018; and WHEREAS, Ordinance 1232 established a consolidated fee schedule; and WHEREAS, the Schedule of Fees may require periodic modification; and WHEREAS, the Fiscal Year 2018-2019 Adopted Budget is supported by these modified and added fees; and WHEREAS, Ordinance 1232 allows for future modification of fees by resolution. NOW, THEREFORE, BE IT RESOLVED that the attached amended fees and added fees (Exhibit A) be included in the Schedule of Fees, upon approval of the City Council and the publication of these fees twice in the newspaper of record. APPROVED AND ADOPTED ON THIS 25th DAY OF SEPTEMBER 2018 BY THE CITY OF CIBOLO. Stos'flboyle, or ill ATTEST: Peggy Cimics, City Secretary Page 7 of 7 Exhibit A Schedule A-2 Building Inspections and Permitting Fees: Additional Fees: Refunds: Minus Plan Review Fee Building and Trade permit refunds (no refund if work began or if permit expired) Failure to schedule required inspection(s): $50.00 Any person/company who fails to schedule a required inspection(s) within 180 days of permit issuance for work described by a permit. No additional permits will be issued to any person/company who has more than one(1)expired permit. Zoning and Development Fees: Plat Related Applications: Floodplain Permit Residential $50 Non-residential $150 CLOMR $200 LOMR without CLOMR $200 LOMR with CLOMR $200 LOMA $100 Flood zone verification letter $25 Master Drainage Plan With PUDs and Master Plans $200 Traffic Impact Analysis Study Review $200 TIA Revision Review $100 TIA Scoping Meeting $0 City Agreements: Amendment to an Agreement 50%of Agreement fee Consultant Fees: Review of construction plans, Professional fees as billed by $2,000, minimum as a deposit reports,drainage studies,TIAs& Engineering and Planning against consultant fees. Staff may any other documents associated consultants, or any reduce this deposit to$750 against with plats,site plans, mixed use consultant utilized by the consultant fees if a project is of concept plans or special legal City to review development minor nature where limited instruments or submittals as applications engineering review is anticipated. necessary per application submitted Codes. Manuals, Maps Unified Development Code (UDC), DVD or CD $10 Cibolo Design &Construction 24 x 36 Color Map Print $30 Manual, Comprehensive/Master 11 X 17 Color Map Print $10 Plan, Parks Master Plan,Zoning Map,City Limits/ETJ Map, Other Custom Map Request(GIS Fees) Minimum 1/2 hour $40 Per hour 9/19/2018 Exhibit A Schedule A-3 Cibolo Police Department-Miscellaneous Fees C. Police Reports and Other Documentation: Body-worn camera video or audio recording(per recording) $10.00 Body-worn camera video or audio recording (per minute of recording) $1.00 Schedule A-6 Drainage and Utility Fees Chipper Service $20 per 1/2 hour Water Rates Multi-family: First(1,000 gallons x LUE)based on Meter Size(below) Tier 1 1,001 to 7,000(x LUE) additional $5.50 Per Tgal Tier 2 7,001 to 15,000(x LUE) additional $7.00 Per Tgal Tier 3 15,001 to 30,000(x LUE) additional $8.50 Per Tgol Tier 4 30,001 to 50,000(x LUE) additional $10.00 Per Tgal Tier 5 Over 50,000(x LUE) additional $12.50 Per Tgal Meter Size-L UE $ Meter Size $ 31411- 1.5 30.00 3"- 16 320.00 1"- 2.5 50.00 4"- 25 500.00 1.5"- 5 100.00 6"- 50 1,000.00 2"- 8 1 _160.00T-10"- 115 2,300.00 Wastewater Rates Residential First 3,000 gallons of water used $16.25 3,001+gallons of water used additional $4.85 Per Tgal Commercial First 3,000 gallons of water used $19.75 3,001+gallons of water used additional $4.85 Per Tgal Multi-family: First 3,000 gallons of water used x LUE $19.75 x LUE (3,001+x LUE)gallons of water use additional $4.85 Per Tgal 9/19/2018 Exhibit A Schedule A-6(continued) Park Fees Niemietz Park Picnic Area Deposit $55.00 Resident $75.00 Nonresident $115.00 Lights per hour omit separate hourly cost Outlets per hour omit separate hourly cost Niemietz Meeting Room Deposit Omit as a separate option Resident Omit as a separate option Nonresident Omit as a separate option Room Cost per hour Omit as a separate option Niemietz Meeting Room and Kitchen Deposit $150.00 Resident $150.00 Nonresident $225.00 Room Cost per hour omit separate hourly cost Niemietz Pavilion Schlather Park Veterans Park Pavilion#1 Deposit $30.00 Resident $75.00 omit separate hourly cost Nonresident $115.00 omit separate hourly cost Electric per hour(Niemietz Park Only) $20.00 Veterans Park Pavilion#2 Deposit $30.00 Resident $50.00 omit separate hourly cost Nonresident $75.00 omit separate hourly cost 9/19/2018