Loading...
Min CC 06/14/1982 CIBOLO CITY COUNCIL MINUTES, JUNE 14, 1982 1. CALL TO ORDER: 7 p.m. Mayor Ed Ling 2. INVOCATION: Mayor Ling 3. QUORUM CHECK: Mayor Ling, Councilmembers: Marge Smith, Fred Niemietz, Bill Little;-Building Insp. Andrew Tolle; Engineers Bill Mullins and Cliff Taylor; City Sec. Barbara Glenewinkel. 4. BUSINESS AT HAND: A. Bill Mullins and Cliff Taylor of W.H. Mullins Engineering Firm attended the meeting to bring the cost estimates of the Drain- age and Paving Project being considered by the City Council. A copy of these figures is attached to original minutes. The total cost estimate is $220,000. The city council had anticipated a cost estimate of $150,000. Mayor Ling stated that Tom Anderlitch, Financial Advisor for the City would be con- sulted concerning a greater amount of bonds. The drainage easement on the Watson, Steves and Flannery property is still in question, so a decision on the drainage and paving was tabled until further information could be obtained. Bill Little (Marge Smith) moved further discussion on the drainage and paving be tabled until 6/17/82. All approved. B. Mr. Mullins stated he had checked the grades on Haeckerville Rd. between F.M. 78 and the 5th or 6th house and he believes the slope could be enough for the first 5 or 6 houses to be connected to the sewer. C. The analysis on the well on Krickhahn property was discussed. Mr. Mullins had a test done and that the report was not good. He advised that the water was not fit for human or animal consumption and that he would suggest the owner of the property be notified. 5. ADJOURNMENT: The meeting was adjourned at 10:50 p.m. with an executive session following to discuss personnel. ED LING, MAYOR BARBARA GLENEWINKEL, SECRETARY