Loading...
RES 1038 09/15/1977RESOLUTION /p _3'J RESOLUTION REQUESTING THE U.S. ARMY, CORPS OF ENGINEERS TO PROVIDE A DETAILED PROJECT STUDY OF THE CIBOLO (REEK FROM THE M.K.T. RAILROAD TO THE SCHAEFER ROAD. Whereas, there have been major floods along the Cibolo Creek causing heavy loss of municipal and private properties and whereas the area lying between the M.K.T. Railroad and the Schaefer Road area which em- braces the cities of Selma, Schertz, Universal City, and Cibolo receives the brunt of such flooding, and Whereas, the low alluvial plain of the Cibolo Creek lies within the boundaries of the cities of Selma, Schertz, and Cibolo and whose families are subject to such flooding, and Whereas, there is strong indications that both man-made and natural obstructions may impede or redirect the natural flow of water and may in fact, increase the severity of flooding. NOW, THEREFORE, EE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF CIBOLO, TEXAS, that: An immediate detailed project engineering study should be conducted by the U.S. Army Corps of Engineers on that portion of the Cibolo Creek lying between the M.K.T. Railroad and the Schaefer Road area; that special emphasis be placed on physical flood control in and around the City of Cibolo; that this requested study propose measures that can be taken to alleviate the severity of flooding, and provide a written report to the City of Cibolo of these findings. ATTEST: PASSED, APPROVED AND ADOPTED this /r day of 25erPMf2Be4 1972•