Loading...
ORD 501 8/10/1999CTTY OF CIBOLO AMMENDMENT ONE TO SUBDIVISION ORDINANCE NUMBER 464 DATED 9 JANUARY 1996 ORDINANCE NO. 501 PAGE 2, "DEFINITIONS" IS AMENDED TO ADD: Number 33. Pre -Construction - ine peno of time pr►ur iii a,Lorauvu o: uALM a. landscape, to include, the movement of ANY dirt. Number 34. Post -Construction — Following the time that there has been alteration of natural landscape and dirt has been moved. PAGE 29, Section IX, "VARIANCES" IS AMENDED TO ADD: A. Subdivision Pre -Construction Variance Requests shall apply to the following; 1. Installing required sewer systems 2. Installing required curbs and gutters 3. Installing required curbs (only) 4. Installing required gutters (only) 5. Installing required sidewalks 6. Installing on-site sewage facility/facilities 7. reduction of lot width from minimum required 8. reduction of lot depth from minimum required ITEMS IN SECTION A. 1 THROUGH 8 SHALL BE AT A RATE OF $100.00 PER REQUEST B. Post -Construction Variance requests shall be as follows; 1. Any variance request for post -construction, as defined, shall beat the rate of $1,000.00 per request. enacted this-/Gl—�-' DAY OF AUGUST, 1999 e:::::2 ?�� L Sam Bauder, Mayor �_. Attest: en Ro erts City Secretary CITY OF CIBOLO AMENDMENT ONE TO SUBDIVISION ORDINANCE NUMBER 464 DATED 9 JANUARY 1996 ORDINANCE NUMBER 501 PAGE 2, "DEFINITIONS" IA AMENDED TO ADD: Number 33. Pre -Construction — The period of time prior to alteration of natural landscape, to include, the movement of ANY dirt. Number 34. Post -Construction — Following the time that there has been alteration of natural landscape and dirt has been moved. PAGE 29, Section IX, "VARIANCES" IS AMENDED TO ADD: A. Subdivision Pre -Construction Variance Requests shall apply to the following; 1. Installing required sewer systems 2. Installing required curbs and gutters 3. Installing required curbs (only) 4. Installing required gutters (only) 5. Installing required sidewalks 6. Installing on-site sewage facility/facilities 7. Reduction of lot width from minimum required footage 8. Reduction of lot depth from minimum required footage ITEMS IN SECTION A.1 THROUGH 8 SHALL BE AT A RATE OF $100.00 PER REQUEST B. Post -Construction Variance requests shall be as follows; 1. Any variance request for post -construction, as defined, shall be at the rate of $1,000 per request. ENACTED THIS/�'�DAY OF SEPTEMBER, 199<'�� SAM BAUDER, MAYOR ATTEST: N ROBERTS CITY SECRETARY