ORD 501 8/10/1999CTTY OF CIBOLO
AMMENDMENT ONE
TO
SUBDIVISION ORDINANCE NUMBER 464 DATED 9 JANUARY 1996
ORDINANCE NO. 501
PAGE 2, "DEFINITIONS" IS AMENDED TO ADD:
Number 33. Pre -Construction - ine peno of time pr►ur iii a,Lorauvu o: uALM a.
landscape, to include, the movement of ANY dirt.
Number 34. Post -Construction — Following the time that there has been alteration
of natural landscape and dirt has been moved.
PAGE 29, Section IX, "VARIANCES" IS AMENDED TO ADD:
A. Subdivision Pre -Construction Variance Requests shall apply to the following;
1. Installing required sewer systems
2. Installing required curbs and gutters
3. Installing required curbs (only)
4. Installing required gutters (only)
5. Installing required sidewalks
6. Installing on-site sewage facility/facilities
7. reduction of lot width from minimum required
8. reduction of lot depth from minimum required
ITEMS IN SECTION A. 1 THROUGH 8 SHALL BE AT A RATE OF $100.00
PER REQUEST
B. Post -Construction Variance requests shall be as follows;
1. Any variance request for post -construction, as defined, shall beat the rate of
$1,000.00 per request.
enacted this-/Gl—�-' DAY OF AUGUST, 1999
e:::::2 ?�� L
Sam Bauder, Mayor
�_. Attest:
en Ro erts
City Secretary
CITY OF CIBOLO
AMENDMENT ONE
TO
SUBDIVISION ORDINANCE NUMBER 464 DATED 9 JANUARY 1996
ORDINANCE NUMBER 501
PAGE 2, "DEFINITIONS" IA AMENDED TO ADD:
Number 33. Pre -Construction — The period of time prior to alteration of natural
landscape, to include, the movement of ANY dirt.
Number 34. Post -Construction — Following the time that there has been alteration
of natural landscape and dirt has been moved.
PAGE 29, Section IX, "VARIANCES" IS AMENDED TO ADD:
A. Subdivision Pre -Construction Variance Requests shall apply to the following;
1. Installing required sewer systems
2. Installing required curbs and gutters
3. Installing required curbs (only)
4. Installing required gutters (only)
5. Installing required sidewalks
6. Installing on-site sewage facility/facilities
7. Reduction of lot width from minimum required footage
8. Reduction of lot depth from minimum required footage
ITEMS IN SECTION A.1 THROUGH 8 SHALL BE AT A RATE OF
$100.00 PER REQUEST
B. Post -Construction Variance requests shall be as follows;
1. Any variance request for post -construction, as defined, shall be at the rate of
$1,000 per request.
ENACTED THIS/�'�DAY OF SEPTEMBER, 199<'��
SAM BAUDER, MAYOR
ATTEST: N ROBERTS
CITY SECRETARY